Property packages
Move-in punch list
The builder leftovers and the box pile, handled in the first week instead of the first year.
New houses in Sharpsburg, Turin, and Newnan close with a list: uncaulked trim, a gate, TVs, blinds that never got hung, clay on the new drive.
We take the practical list and the exterior clean that a new yard requires. Warranty items that belong to the builder are flagged, not quietly absorbed.

Included
- Agreed interior small work
- Drive and walk wash if the yard is still shedding clay
- Assembly and hanging
- A written note of items that are the builder’s
How it is quoted
Day rate from the list you send after closing.
We do not fight the builder’s warranty for you, and we do not redo their paint scope.
In your town
Questions
How do you quote move-in punch list?
Day rate from the list you send after closing.
What should we do before you arrive?
Send photos in daylight, move cars off the work area, and tell us about pets, a pool, or plantings you are particular about. If this is a house call, send the list ahead so we can say half day or full day before we block the calendar.
What will you not take on?
We do not fight the builder’s warranty for you, and we do not redo their paint scope.
Often booked with it
Full exterior detail
House, flatwork, and the obvious extras — one project, one standard, for a property that should look kept on every side.
Pre-listing curb appeal
The outside of a house made ready for photographs and the first showing.
Post-construction exterior wash
The builder dust, clay, and stickers taken off a new house before the owner moves the furniture in.
Owner walkthrough with Alton
Alton on the property, in person, to set the scope before a large house or a commercial site is booked.